Deliverables
A. Preparatory actions
A1. Consultation for the authorisation of diversification of fishing activities
DA1.1. List of critical factors, authorities to be consulted and step to follow to get the authorisation
DA1.2. Qualitative risk assessment
A2. Setting up of the advisory group
DA2.1. Confirmed participation list of stakeholders in the advisory group
B. Implementation actions
B1. Preparation of the vessels and barrier for FML (floating marine litter) collection
DB1.1. Selection of technology and target fleet (including the socio-economic analysis of the fleet)
B2. Operational FML detection and forecasting of hotspots in the surface coastal ocean
DB2.1. Reporting of FML onshore and offshore detection system
DB2.2. Operational FML evolution forecasting system based on Real Time metocean data
DB2.3. Operational alert system on Biarritz test site
DB2.4. List of entities tha have used and/or tested the alert system
B3. Vessel monitoring and energy efficiency
DB3.1. Energy audit of vessels including the assessment of energy saving measures
B4. LCA (life cycle assesment) and eco-management of FML
DB4.1. LCA of marine litter management options and set of eco-design criteria for FML management plan
DB4.2. Report on the environmental effect of the poject solutions
B5. Computing tool
DB5.1. Computing tool and manual
B6. Demonstration of the operative strategy
DB6.1. Minutes of training given to fishers and vessel operators on FML removal
DB6.2. Database of FML removal
DB6.3. Report on collection activities, including collection location map, and characterisation and weight of marine litter collected by 5 vessels
DB6.4. Report on the effectiveness of the Satellite-tracked low-cost drifters, biodegradable floating tags, feedback from coast users observations and sea trips
DB6.5. Report on the results of the marine litter collection campaign in Mutriku
B7. Assesment and validation strategy
DB7.1. Minutes of advisory group meetings with list of confirmed stakeholder participants
DB7.2. Validated computing tool and management plan
DB7.3. Marine litter collection and management
DB7.4. Study of marine litter sources on the validation sites
C. Monitoring of the impact of the project actions
C1. Monitoring of the impact of the projects actions
DC1.1. Monitoring impact – beginning
DC1.2. Monitoring impact – midterm
DC1.3. Monitoring impact – end
C2. Monitoring of the socio-economic impact of the project
DC2.1. Report on the socio-economic impact of the project
D. Public awareness and dissemination of results
D1. Activities for general public/specialist public
DD1.1. Notice boards
DD1.2. Guidelines on website sepcifications
DD1.3. Layman’s report
DD1.4. Logo and branding book
DD1.5. Folders with templates
DD1.6. Videos
DD1.7. Communication and dissemination plan
DD1.8. Scientific publications in peer-reviewed journals
DD1.9. Conference paper/poster
D2. Activities for potential end-users
DD2.1. Project’s database
DD2.2. Compilation of LEMA Network minutes
DD2.3. LEMA Network operating procedure and roadmap
DD2.4. Number of entities engaged in the use of the handbook
DD2.5. Electronic handbook
E. Project management
E1. Overall project management
DE1.1. Minutes of kick-off meeting
E2. Audit
DE2.1. Audit report
E3. After-LIFE plan
DE3.1. After-LIFE communication plan